LED display installation in common
Environment due to the LED display industry with it, its installation method is different also. Generally tend to have the indoor LED display installation way: embedded installation, wall-mounted installation, wall-mounted installation, etc.; Outdoor LED display is installed with pillar and roof type is relatively common. Below small make up is LED display manufacturers installation method to do a detailed description:
LED display, however, because of the particularity of the product, installation and debugging process can often reflect the quality of our products and also decides the effect of display when use, therefore, the LED display installation and debugging is a very important technology work, at this point, small make up putting together the LED display industry common six kind of installation method:
What are the LED display common installation way? Common installation view
1, inlaying installation: indoors, apply to smaller indoor screen. Due to the small space, in order to do not take up space, according to the screen size on the wall to dig out the area of the same size, the LED display embedded in the wall. Wall for the solid wall. With the method of before the maintenance, the cost is higher. Suitable for outdoor installation, set structure in building project has been included in the planning and designing the screen, in the civil engineering project construction reserved in advance screen installation space, only when the actual installation steel structure will make screen display embedded within the building metope, adequate maintenance space on the back.
More than 2, wall-mounted installation: suitable for the installation of the indoor LED display, smaller (below 10 square meters), wall is solid walls, hollow bricks or simple retaining wall are not suitable for the installation.
More than 3, hanging installation: suitable for the station LED electronic display screen, LED electronic display screen and other places of large airport signage. Request screen area is lesser. (below 10 square metre) requirements and must have the appropriate installation location, such as beams or columns above, and the screen body in general to add back cover.
Ordinary mount is suitable for the single box display screen is less than the total weight 50 kg, can be directly on the main wall, need not reserve maintenance space, display cabinet adopt positive maintenance design, servicing uncovers the screen from the bottom of the can.
Rack mount applicable to the general outdoor display, considering the difficulty of the display when maintenance, between the screen and the metope with steel structure support, set aside 800 mm maintenance space, space., maintenance facilities such as gym, and installation of power distribution cabinet, air conditioning, axial flow fan, lighting and other auxiliary equipment,
For more than 4, pillar type installation: the installation of outdoor advertising LED electronic display screen, eye shot is open, around the place empty, such as square, parking lot, etc. According to the size of the screen area and can be divided into the installation of single column and double column type. Column installed in suitable for the installation of the LED display, outdoor screen is installed on the pillar. Column type in addition to the need to make the screen body steel structure, still need to make concrete or steel columns, mainly considering the geological condition.
5, rooftop installation: mainly applied to outdoor advertising LED electronic display screen, the installation site is mainly the roof of the building, with the increase of building height to consider windproof level along with the increase.
6, the structure of the buildings is on the ground with concrete build by laying bricks or stones a enough to support the whole LED display wall wall, construction steel structure installation screen on the wall, steel structure reserved 800 mm space for maintenance, related equipment and maintenance facilities place.
Outdoor LED display installation considerations
Outdoor LED display area is larger, the steel structure design should consider basic, wind load and earthquake magnitude, waterproof, dustproof, environmental temperature, lightning protection, and many other factors. Placed inside the steel structure to power distribution cabinet, air conditioning, axial flow fan, lighting and other auxiliary equipment, also have., maintenance facilities such as gym. The outdoor screen structure to conform to the following IP65 protection class. In general, outdoor LED display installation considerations are:
(1) display installed outdoors, and often, the wind dust cover, poor working conditions. Electronic equipment is wet or seriously be affected with damp be affected with damp will cause a short circuit or even fire, fault and even fire, loss.
(2) the display may be heavy current strong magnetic attacks caused by lightning.
(3) the environment temperature changes greatly. Display itself will generate a certain amount of heat at work, if the environment temperature and heat dissipation, integrated circuit may not work properly, and even destroyed, so that the display system cannot work normally.
(4) at a wide, line-of-sight requirement, vision requires far and wide; Change of ambient light, and in particular may be direct sunlight.
Special requirements for the above, the outdoor screen installation must be done:
(1) screen and screen and building the junction must be strictly waterproof leakage protection; Screen should have good drainage measures, in the event of water discharge smoothly.
(2) on the screen and building installation of lightning protection devices. Display the main body and the shell good grounding, grounding resistance is less than 3 ohm, lightning causes a large current discharge in a timely manner.
(3) install ventilation cooling equipment, makes the screen body internal temperature between - 10 ℃ to 40 ℃. Behind the screen above installed axial flow fan, exhaust heat.
(4) choose working temperature between - 40 ℃ ~ 80 ℃ of industrial-grade integrated circuit chips, prevent winter low temperature display cannot start.
(5) with the direct sunlight, dustproof, waterproof, prevent heat, prevent short circuit "five prevention" characteristics.
Transparent & ice screen